Texas Tech University, Bachelors of B.A.
Management Information SystemsManager of Information Technology
Xtera Communications, Inc. - Allen, TX- Responsible for all day to day IT activities within the organization
- Plan and maintain information technology strategies by managing an international staff; researching and implementing technological global strategic solutions.
- Accomplish financial objectives by forecasting requirements; preparing an annual budget; scheduling expenditures.
- Preserve assets by implementing disaster recovery and back-up procedures and information security and control structures.
Systems Administrator
Xtera Communications, Inc. - Allen, TXAdminister network and server infrastructure, and providing technical support to 250 total users in 6 locations world-wide. Maintenance of the WAN and LAN systems, including installing, diagnosing, repairing, maintaining, and upgrading software & hardware equipment while ensuring network connectivity and optimal performance. Managed new install projects for servers, desktops, network infrastructure upgrades. Thru corporate acquisition assisted in several MS Active Directory domain migrations and MS Exchange implementations.
Network/Systems Administrator
Advanced Data Spectrum - Allen, TXResponsible for implementing, configuring, and maintaining all aspects of the IT infrastructure. Including but not limited to the data network, telecommunications, and computer systems that encompass the entire technology ecosystem for the organization.
NIST 800-171
Role: Project LeadI have successfully implemented NIST 800-171 framework into my current organization, strengthening the security of the organization I lead.
SOX compliance – IT Controls
Role: ImplementerDocumented, evaluated, and improved necessary internal controls due to the intent of the company thru the initial public offering (IPO) process. Main lesson learned here is this project is never completed!
Salesforce.com Implemenation
Role: Project Manager, ImplementerProject involved capturing all activities and documents related to the sales process. Building the project team, implementing the proper changes to salesforce, developing the roll-out plan, and administering the system post depoy.
Physical to Virtual server Migration
Role: Project LeadPerformed all activities related to pre-conversion planning, preparation, conversion, and post-conversion of the P2V migration process.
Corporate Website Development
Role: Project ManagerThe current corporate website was unacceptable because of navigation problems, performance issues and dated look. Worked with the corporate marketing team, and a website design firm to redesign the site.
Active Directory Domain Migration
Role: Systems AdministratorShortly before being hired on with Xtera Communications, the company had just acquired 4 other companies in the time frame for 8 months. In my role as Systems Administrator I worked with the IT Manager, and Director of IT to prepare the migration thru proper documentation of the existing environments, analyze the reports, and present interoperability recommendations. Also assisted in the back end migration of 3 separate domains into our own and creating a two way trust between the forth domain. Performed all tasks with updating and bringing end devices up to company compliance.